CONTRACT NO. 2010-6 Orange Alley Phase III Sewer Replacement

PROJECT DESCRIPTION

 Bids are invited for the replacement of sewer lines along Orange Alley. Work includes
 the replacement of 20” sewer lines with 24” sewer lines and manholes and reconnection
 of laterals.

 Following are approximate items and quantities for the base bid:

Item No.

Quantity

Unit

Item Description

1

Lumpsum

LS

Mobilization

2

2,600

LF

24” sewer line

3

2,000

CY

Select material backfill

4

12

EA

Manholes 0’ to 6’

5

55

VF

Manholes over 6’

6

12

EA

Manhole frames and covers

7

3

EA

6” lateral connections

8

910

SY

SuperPave Asphalt Mixture Design, HMA Wearing Course, PG 64-22, < 0.3 million ESALs, 19 mm mix, 3” depth, SRL-L

9

861

SY

Seed and Mulch

10

Lumpsum

LS

Erosion and sedimentation controls

11

Lumpsum

LS

Tie into existing system (includes bypass pumping)

12

12

EA

Removal of existing manholes

13

52

LF

15” Sewer line


       

 

 

 

 

 

 