Home
History
Summary of
Services
Service Briefs
Employment
Contact Us
Projects
Out to Bid
|
PROJECT DESCRIPTION
The project consists of the expansion of the
aircraft rescue and fire fighting building.
Following are approximate items and quantities
for the base bid and Alternate No. 1:
BASE BID
|
Section
309A |
755 |
SY |
SuperPave Asphalt Mixture Design, HMA
Base Course, PG-58-28, <0.3 million ESALs, 19 mm mix, 4˝” depth
|
|
Section 350A |
755 |
SY |
Subbase, 6” Depth, No. 2A |
|
Section 409A |
755 |
SY |
SuperPave Asphalt Mixture Design, HMA
Wearing Course, PG -58-28, <0.3 million ESALs, 9.5 mm mix, 1˝”
Depth, SRL-L |
|
P-152 |
500 |
CY |
Excavation and Embankment |
|
T-900 |
Lumpsum |
LS |
Seeding and Mulching |
|
S-100 |
Lumpsum |
LS |
Contractor’s Plant |
|
S-200 |
Lumpsum |
LS |
Safety Requirements |
|
MB-60 |
Lumpsum |
LS |
Building Excavation, Filling and Grading |
|
MB-70 |
Lumpsum |
LS |
Concrete Work |
|
MB-75 |
Lumpsum |
LS |
Concrete Floor Sealing System |
|
MB-80 |
Lumpsum |
LS |
Masonry Work |
|
MB-100 |
Lumpsum |
LS |
Pre-Engineered Metal Building |
|
MB-150 |
Lumpsum |
LS |
Tension Fabric Storage Structure |
|
MB-200 |
Lumpsum |
LS |
Overhead Doors |
|
MB-520 |
Lumpsum |
LS |
Metal Lockers |
|
MB-700 |
Lumpsum |
LS |
Pallet Racks |
|
MB-850 |
Lumpsum |
LS |
Kitchen Cabinets |
|
MB-900 |
Lumpsum |
LS |
General Mechanical Requirements |
|
MB-950 |
Lumpsum |
LS |
General Plumbing Requirements |
|
MB-1000 |
Lumpsum |
LS |
Electrical Work |
Alternate No. 1
|
|
|
Deduct for Eastern 18’ Bay as shown |
Last Updated 07/30/10 |
|